Go to AgTreks Home




Note: Going home clears all of these panels.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.


  • Seeding and Planting, corn
  •    This crop planting operation example adds a timeliness penalty calculation to regular operation costs.  (<  preview IRI

  •    Sample data sets are used in DevTreks tutorials. This example includes a timeliness penalty calculation.  (<  preview IRI

  •    Sample data sets are used in DevTreks tutorials. This example includes a timeliness penalty calculation.  (<  preview IRI

  •    soybeans moved to their own operation group -needs to be deleted from a base testing budget before removal here  (<  preview IRI

  •    Sample data sets are used in DevTreks tutorials. This example includes a timeliness penalty calculation.  (<  preview IRI

  •    Sample data sets are used in DevTreks tutorials. This example includes a timeliness penalty calculation.  (<  preview IRI

  •    Sample data sets are used in DevTreks tutorials. This example includes a timeliness penalty calculation.  (<  preview IRI

  •    Sample data sets are used in DevTreks tutorials. This example includes a timeliness penalty calculation.  (<  preview IRI


Synchronize panels by clicking the panel directional buttons found at the top of the panel.


Synchronize panels by clicking the panel directional buttons found at the top of the panel.









Uploading a new file will replace any existing file. If necessary, please package and download the existing file prior to this action. If the file has been uploaded successfully, this page will refresh and show the new file information. If the file can't be uploaded (i.e. exceeds 60MB, unsupported mimetype, bad xml, bad html) this page will refresh and show the existing file information.

The file has been uploaded.